{"id":45864,"date":"2024-03-26T19:28:24","date_gmt":"2024-03-26T18:28:24","guid":{"rendered":"https:\/\/www.furious-squad.com\/financial-management-in-an-agency-secure-the-profitability-of-your-projects\/"},"modified":"2025-04-09T13:29:49","modified_gmt":"2025-04-09T11:29:49","slug":"agency-financial-management-profit","status":"publish","type":"post","link":"https:\/\/www.furious-squad.com\/en\/agency-financial-management-profit\/","title":{"rendered":"Financial Management in an Agency: Secure the Profitability of Your Projects"},"content":{"rendered":"\t\t<div data-elementor-type=\"wp-post\" data-elementor-id=\"45864\" class=\"elementor elementor-45864\" data-elementor-post-type=\"post\">\n\t\t\t\t<div class=\"elementor-element elementor-element-7e6e370 e-con-full e-flex e-con e-parent\" data-id=\"7e6e370\" data-element_type=\"container\">\n\t\t\t\t<div class=\"elementor-element elementor-element-0754106 elementor-blockquote--skin-border elementor-blockquote--button-color-official elementor-widget elementor-widget-blockquote\" data-id=\"0754106\" data-element_type=\"widget\" data-widget_type=\"blockquote.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t<blockquote class=\"elementor-blockquote\">\n\t\t\t<p class=\"elementor-blockquote__content\">\n\t\t\t\t<i>A figure lives only because it is shared and enriched by all the players in the chain.<\/i>\t\t\t<\/p>\n\t\t\t\t\t\t\t<div class=\"e-q-footer\">\n\t\t\t\t\t\t\t\t\t\t\t<cite class=\"elementor-blockquote__author\">Matthieu Didailler, CFO d\u2019Insign<\/cite>\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t\t<\/blockquote>\n\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-02ce76b elementor-widget elementor-widget-text-editor\" data-id=\"02ce76b\" data-element_type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p><span style=\"font-weight: 400;\">This quote takes on its full meaning in the context of agencies, where financial management is more than just monitoring columns of figures. It&#8217;s a real balance between precision, anticipation and adaptation, where each player must play his part to avoid the pitfalls of imprecision. <\/span><\/p>\n\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-b2d13a7 elementor-align-center elementor-widget elementor-widget-button\" data-id=\"b2d13a7\" data-element_type=\"widget\" data-widget_type=\"button.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<div class=\"elementor-button-wrapper\">\n\t\t\t\t\t<a class=\"elementor-button elementor-button-link elementor-size-sm\" href=\"https:\/\/www.furious-squad.com\/en\/contact\/\">\n\t\t\t\t\t\t<span class=\"elementor-button-content-wrapper\">\n\t\t\t\t\t\t\t\t\t<span class=\"elementor-button-text\">Discover Furious<\/span>\n\t\t\t\t\t<\/span>\n\t\t\t\t\t<\/a>\n\t\t\t\t<\/div>\n\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-462f54c elementor-widget elementor-widget-spacer\" data-id=\"462f54c\" data-element_type=\"widget\" data-widget_type=\"spacer.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t<div class=\"elementor-spacer\">\n\t\t\t<div class=\"elementor-spacer-inner\"><\/div>\n\t\t<\/div>\n\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-6f370f0 elementor-widget elementor-widget-text-editor\" data-id=\"6f370f0\" data-element_type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p>And the stakes are high: only 36% of organizations manage to deliver their projects within budget, according to the <a href=\"https:\/\/www.google.com\/url?q=https:\/\/www.pmi.org\/learning\/thought-leadership\/megatrends&amp;sa=D&amp;source=docs&amp;ust=1740060989848891&amp;usg=AOvVaw0UMGHYEEyhaQS2EJWPUQwQ\">Project Management Institute<\/a>. A figure that highlights the complexity of project management and the importance of rigorous financial management. <\/p>\n\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-84f4b62 elementor-widget elementor-widget-heading\" data-id=\"84f4b62\" data-element_type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t<h2 class=\"elementor-heading-title elementor-size-default\">Which projects are you losing money on?<\/h2>\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-cfecdc0 elementor-widget elementor-widget-text-editor\" data-id=\"cfecdc0\" data-element_type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p data-start=\"843\" data-end=\"1313\">As your agency grows, so does the workload. Financial teams, overwhelmed by repetitive tasks, find it hard to step back and focus on what really matters: profitability. How much time do your teams really devote to each project? Are your business units profitable? And are your individual occupancy rates optimized? These are all questions that deserve precise answers.     <\/p>\n<p data-start=\"1315\" data-end=\"1560\">It&#8217;s no longer enough to note budget overruns after the fact. To secure your margins, you need strategic reflexes and the right tools to assess the profitability of your projects in real time. <\/p>\n\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-0be028e elementor-widget elementor-widget-text-editor\" data-id=\"0be028e\" data-element_type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p data-start=\"81\" data-end=\"540\">In the ultra-competitive world of agencies, knowing which projects are making you lose money is essential. A deficit never happens by chance. Often, it&#8217;s the result of over-optimistic initial estimates, a poorly controlled project scope, or delays in deliverables that drive up costs. The question is not <em>if<\/em>, but <em>when<\/em> &#8211; and, above all, how to react before it&#8217;s too late.   <\/p>\n\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-9a57b76 elementor-widget elementor-widget-heading\" data-id=\"9a57b76\" data-element_type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t<h3 class=\"elementor-heading-title elementor-size-default\">Identify your loss-making projects now<\/h3>\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-3034caf elementor-widget elementor-widget-text-editor\" data-id=\"3034caf\" data-element_type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p data-start=\"601\" data-end=\"839\">The first step in reversing the trend is to be able to <strong data-start=\"667\" data-end=\"699\">spot warning signs<\/strong> as early as possible. This means setting up a reliable system for monitoring key indicators. You need to monitor :<\/p><ul data-start=\"840\" data-end=\"1183\"><li data-start=\"840\" data-end=\"931\"><strong data-start=\"842\" data-end=\"868\">Project progress<\/strong>: How is production progressing in relation to what has been sold?<\/li><li data-start=\"932\" data-end=\"1055\"><strong data-start=\"934\" data-end=\"963\">Actual time spent<\/strong>: How many hours have your teams already spent, by skill or business unit?<\/li><li data-start=\"1056\" data-end=\"1183\"><strong data-start=\"1058\" data-end=\"1079\">Costs incurred<\/strong>: What are the direct costs (services, purchases) and indirect costs (internal expenses) associated with the project?<\/li><\/ul><p data-start=\"1185\" data-end=\"1666\"><br \/>However, if you&#8217;re like most agencies, you probably have a <strong data-start=\"1274\" data-end=\"1304\">problem with centralized<\/strong> information. Each team uses its own tools, often unconnected to each other. The result: retrieving the right data becomes a headache, and the exercise soon resembles that of a tightrope walker on a tightrope. The more scattered the information, the greater the risk of basing your decisions on erroneous or incomplete data.<\/p><p data-start=\"1668\" data-end=\"1992\"><strong data-start=\"1671\" data-end=\"1705\">What this means for you<\/strong>: Without immediate visibility of these indicators, it&#8217;s virtually impossible to effectively manage your profitability. To move forward with confidence, you need to be able to consult this data <strong data-start=\"1896\" data-end=\"1913\">in real time<\/strong> and make informed decisions <strong data-start=\"1949\" data-end=\"1958\">before<\/strong> the situation deteriorates.<\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-9271412 elementor-align-center elementor-widget elementor-widget-button\" data-id=\"9271412\" data-element_type=\"widget\" data-widget_type=\"button.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<div class=\"elementor-button-wrapper\">\n\t\t\t\t\t<a class=\"elementor-button elementor-button-link elementor-size-sm\" href=\"https:\/\/www.furious-squad.com\/en\/furious-project-management-software\/\">\n\t\t\t\t\t\t<span class=\"elementor-button-content-wrapper\">\n\t\t\t\t\t\t\t\t\t<span class=\"elementor-button-text\">Identify your loss-making projects now<\/span>\n\t\t\t\t\t<\/span>\n\t\t\t\t\t<\/a>\n\t\t\t\t<\/div>\n\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-ae10945 elementor-widget elementor-widget-spacer\" data-id=\"ae10945\" data-element_type=\"widget\" data-widget_type=\"spacer.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t<div class=\"elementor-spacer\">\n\t\t\t<div class=\"elementor-spacer-inner\"><\/div>\n\t\t<\/div>\n\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-142f680 elementor-widget elementor-widget-heading\" data-id=\"142f680\" data-element_type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t<h3 class=\"elementor-heading-title elementor-size-default\">Tools: allies or obstacles?\n<\/h3>\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-2a01099 elementor-widget elementor-widget-text-editor\" data-id=\"2a01099\" data-element_type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p data-start=\"2041\" data-end=\"2355\">For finance teams, analyzing loss-making projects can quickly turn into a nightmare. Why is this? Because the tools used in-house are often under-utilized, poorly parameterized or, worse still, non-existent. Relying on outdated spreadsheets or scattered solutions can be costly.   <\/p>\n<p data-start=\"2357\" data-end=\"2637\">Let&#8217;s take the example of an agency managing 20 simultaneous projects. If you spend several hours a week manually compiling time tracking, billing and costing data, not only are you wasting valuable time, but you&#8217;re also multiplying the risk of errors. <\/p>\n<p data-start=\"2639\" data-end=\"2893\">Ideally?  <\/p>\n<p>A centralized tool capable of :<\/p>\n<ul>\n<li data-start=\"2639\" data-end=\"2893\"><strong>Automatically aggregate<\/strong> data from all your teams<\/li>\n<li data-start=\"2639\" data-end=\"2893\"><strong>Display<\/strong> clear, up-to-date profitability <strong>indicators<\/strong> <\/li>\n<li data-start=\"2639\" data-end=\"2893\"><strong>Issue alerts<\/strong> as soon as a project exceeds its break-even point<\/li>\n<\/ul>\n\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-f92d502 elementor-widget elementor-widget-image\" data-id=\"f92d502\" data-element_type=\"widget\" data-widget_type=\"image.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<img fetchpriority=\"high\" decoding=\"async\" width=\"800\" height=\"800\" src=\"https:\/\/www.furious-squad.com\/wp-content\/uploads\/2024\/03\/\ud83c\uddec\ud83c\udde7-1024x1024.jpg\" class=\"attachment-large size-large wp-image-59531\" alt=\"\" srcset=\"https:\/\/www.furious-squad.com\/wp-content\/uploads\/2024\/03\/\ud83c\uddec\ud83c\udde7-1024x1024.jpg 1024w, https:\/\/www.furious-squad.com\/wp-content\/uploads\/2024\/03\/\ud83c\uddec\ud83c\udde7-300x300.jpg 300w, https:\/\/www.furious-squad.com\/wp-content\/uploads\/2024\/03\/\ud83c\uddec\ud83c\udde7-150x150.jpg 150w, https:\/\/www.furious-squad.com\/wp-content\/uploads\/2024\/03\/\ud83c\uddec\ud83c\udde7-768x768.jpg 768w, https:\/\/www.furious-squad.com\/wp-content\/uploads\/2024\/03\/\ud83c\uddec\ud83c\udde7-24x24.jpg 24w, https:\/\/www.furious-squad.com\/wp-content\/uploads\/2024\/03\/\ud83c\uddec\ud83c\udde7-48x48.jpg 48w, https:\/\/www.furious-squad.com\/wp-content\/uploads\/2024\/03\/\ud83c\uddec\ud83c\udde7-96x96.jpg 96w, https:\/\/www.furious-squad.com\/wp-content\/uploads\/2024\/03\/\ud83c\uddec\ud83c\udde7.jpg 1080w\" sizes=\"(max-width: 800px) 100vw, 800px\" \/>\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-fc90da0 elementor-widget elementor-widget-heading\" data-id=\"fc90da0\" data-element_type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t<h3 class=\"elementor-heading-title elementor-size-default\">Why this step is essential\n<\/h3>\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-f2c1bf8 elementor-widget elementor-widget-text-editor\" data-id=\"f2c1bf8\" data-element_type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p data-start=\"2947\" data-end=\"3179\">To ignore this phase is to accept that you&#8217;re navigating blindly. However, with the right reflexes, identifying your loss-making projects becomes a quick and efficient process. The earlier you intervene, the less the deficit will impact your margins.  <\/p>\n<p data-start=\"3181\" data-end=\"3361\"><strong data-start=\"3184\" data-end=\"3194\">Tip<\/strong>: Schedule weekly checkpoints on your high-risk projects. This will enable you to detect slippage before it becomes unmanageable. <\/p>\n\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-0e99fad elementor-align-center elementor-widget elementor-widget-button\" data-id=\"0e99fad\" data-element_type=\"widget\" data-widget_type=\"button.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<div class=\"elementor-button-wrapper\">\n\t\t\t\t\t<a class=\"elementor-button elementor-button-link elementor-size-sm\" href=\"https:\/\/www.furious-squad.com\/en\/contact\/\">\n\t\t\t\t\t\t<span class=\"elementor-button-content-wrapper\">\n\t\t\t\t\t\t\t\t\t<span class=\"elementor-button-text\">Discover Furious<\/span>\n\t\t\t\t\t<\/span>\n\t\t\t\t\t<\/a>\n\t\t\t\t<\/div>\n\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-96f368e elementor-widget elementor-widget-spacer\" data-id=\"96f368e\" data-element_type=\"widget\" data-widget_type=\"spacer.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t<div class=\"elementor-spacer\">\n\t\t\t<div class=\"elementor-spacer-inner\"><\/div>\n\t\t<\/div>\n\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-687665f elementor-widget elementor-widget-spacer\" data-id=\"687665f\" data-element_type=\"widget\" data-widget_type=\"spacer.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t<div class=\"elementor-spacer\">\n\t\t\t<div class=\"elementor-spacer-inner\"><\/div>\n\t\t<\/div>\n\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t<div class=\"elementor-element elementor-element-360c8e0 e-flex e-con-boxed e-con e-parent\" data-id=\"360c8e0\" data-element_type=\"container\">\n\t\t\t\t\t<div class=\"e-con-inner\">\n\t\t\t\t<div class=\"elementor-element elementor-element-e229db7 elementor-widget elementor-widget-heading\" data-id=\"e229db7\" data-element_type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t<h2 class=\"elementor-heading-title elementor-size-default\">Analysis and Diagnosis<\/h2>\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-1dfcdb8 elementor-widget elementor-widget-text-editor\" data-id=\"1dfcdb8\" data-element_type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p>Identifying loss-making projects is essential. But to correct the situation in the long term, it&#8217;s not enough to simply identify budget overruns: we need to understand the underlying causes. Why does a project exceed the initial budget? How can this be avoided in future projects? This analysis phase enables us to move from observation to action, by precisely targeting the points of failure.    <\/p>\n\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-8fb8be1 elementor-widget elementor-widget-heading\" data-id=\"8fb8be1\" data-element_type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t<h3 class=\"elementor-heading-title elementor-size-default\">Understanding the underlying causes<\/h3>\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-d3d246f elementor-widget elementor-widget-text-editor\" data-id=\"d3d246f\" data-element_type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p data-start=\"511\" data-end=\"743\">Behind a loss-making project often lies a combination of factors. Without an in-depth diagnosis, it&#8217;s difficult to implement appropriate solutions. Several sources of variance are frequently observed in agencies:  <\/p>\n<ul data-start=\"745\" data-end=\"1075\">\n<li data-start=\"745\" data-end=\"791\">Inadequate resource planning<\/li>\n<li data-start=\"792\" data-end=\"852\">Over-optimistic or incomplete initial estimates<\/li>\n<li data-start=\"853\" data-end=\"938\">Unclear management of the project scope, leading to unanticipated adjustments<\/li>\n<li data-start=\"939\" data-end=\"999\">Accumulated delays generate additional costs<\/li>\n<li data-start=\"1000\" data-end=\"1075\">Communication problems between internal teams and with customers<br><br><\/li>\n<\/ul>\n<p data-start=\"1077\" data-end=\"1440\">For every project with a deficit, it&#8217;s essential to document the discrepancies between forecasts and reality. Where are the biggest overruns? Is it unplanned time spent, over-budget purchases or underestimated expenses? This detailed understanding is essential to avoid making the same mistakes in the future.   <\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-b102dde blkCitation elementor-widget elementor-widget-image-box\" data-id=\"b102dde\" data-element_type=\"widget\" data-widget_type=\"image-box.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t<div class=\"elementor-image-box-wrapper\"><div class=\"elementor-image-box-content\"><h3 class=\"elementor-image-box-title\">Paul Vedrine, Management Control Officer - Jin Agency <\/h3><p class=\"elementor-image-box-description\"><i>The advantage of using multitasking software is the obvious connections between the different tasks. Using such software allows you to keep a broad financial scope in mind.<\/i><\/p><\/div><\/div>\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-92be99f elementor-widget elementor-widget-heading\" data-id=\"92be99f\" data-element_type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t<h3 class=\"elementor-heading-title elementor-size-default\">Turning analysis into concrete action<\/h3>\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-3d753d5 elementor-widget elementor-widget-text-editor\" data-id=\"3d753d5\" data-element_type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p data-start=\"1495\" data-end=\"1744\">The aim of a diagnosis should not be limited to simple observation. It is a lever for rectifying the current situation and better preparing future projects. Once the causes have been identified, several actions can be envisaged:  <\/p>\n<ul data-start=\"1746\" data-end=\"2080\">\n<li data-start=\"1746\" data-end=\"1812\"><strong>Reallocate resources<\/strong> to balance the workload<\/li>\n<li data-start=\"1813\" data-end=\"1892\"><strong>Renegotiate deadlines<\/strong> or adjust deliverables with the customer if necessary<\/li>\n<li data-start=\"1893\" data-end=\"1977\"><strong>Revise forecasts<\/strong> for the remaining phases of the project to limit damage<\/li>\n<li data-start=\"1978\" data-end=\"2080\"><strong>Implement<\/strong> more rigorous validation <strong>processes<\/strong> for scope changes<br><br><\/li>\n<\/ul>\n<p data-start=\"2082\" data-end=\"2327\">This stage involves clear communication with your teams and customers. Being transparent about the adjustments required helps avoid misunderstandings and maintain trust, while fostering a collaborative working environment. <\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-3509708 elementor-widget elementor-widget-heading\" data-id=\"3509708\" data-element_type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t<h3 class=\"elementor-heading-title elementor-size-default\">The importance of a reliable tool<\/h3>\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-8485ada elementor-widget elementor-widget-text-editor\" data-id=\"8485ada\" data-element_type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p data-start=\"2370\" data-end=\"2746\">Relevant analysis requires the right information. Many agencies, however, find it difficult to collect and process data. When tools are dispersed or poorly synchronized, teams spend a considerable amount of time manually cross-checking figures. This process is not only time-consuming, but also error-prone.   <\/p>\n<p data-start=\"2748\" data-end=\"3123\">A centralized management tool gives you instant visibility of budget variances, hours consumed and margins associated with each project. Thanks to automated reports and configurable alerts, you&#8217;ll be able to react quickly. You can identify deviations as soon as they appear, rather than at the end of the project, when margins have already been impacted.  <\/p>\n\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-d5ce84b elementor-widget elementor-widget-heading\" data-id=\"d5ce84b\" data-element_type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t<h3 class=\"elementor-heading-title elementor-size-default\">Adopting the right reflexes for the future<\/h3>\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-a5294b5 elementor-widget elementor-widget-text-editor\" data-id=\"a5294b5\" data-element_type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p>Diagnostics must become an integral part of your processes. Regular checks not only enable you to correct deviations on current projects, but also to capitalize on lessons learned for future assignments. Each analysis enriches your ability to anticipate, adjust your practices and boost the profitability of your projects.  <\/p>\n\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t<div class=\"elementor-element elementor-element-4a250fc e-flex e-con-boxed e-con e-parent\" data-id=\"4a250fc\" data-element_type=\"container\">\n\t\t\t\t\t<div class=\"e-con-inner\">\n\t\t\t\t<div class=\"elementor-element elementor-element-a9da74b elementor-widget elementor-widget-heading\" data-id=\"a9da74b\" data-element_type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t<h2 class=\"elementor-heading-title elementor-size-default\">Action Plan<\/h2>\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-b18d593 elementor-widget elementor-widget-text-editor\" data-id=\"b18d593\" data-element_type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p>Once the diagnosis has been made, it&#8217;s time to take action. Having accurate data on your loss-making projects is essential, but it&#8217;s no use if this information doesn&#8217;t lead to concrete decisions and corrective measures. Putting things right requires a clear plan, tailored to each project concerned.  <\/p>\n\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-938b94f elementor-align-center elementor-widget elementor-widget-button\" data-id=\"938b94f\" data-element_type=\"widget\" data-widget_type=\"button.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<div class=\"elementor-button-wrapper\">\n\t\t\t\t\t<a class=\"elementor-button elementor-button-link elementor-size-sm\" href=\"https:\/\/www.furious-squad.com\/en\/financial-pre-accounting-software\/\">\n\t\t\t\t\t\t<span class=\"elementor-button-content-wrapper\">\n\t\t\t\t\t\t\t\t\t<span class=\"elementor-button-text\">Optimize your project budgeting<\/span>\n\t\t\t\t\t<\/span>\n\t\t\t\t\t<\/a>\n\t\t\t\t<\/div>\n\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-fdf2938 elementor-widget elementor-widget-spacer\" data-id=\"fdf2938\" data-element_type=\"widget\" data-widget_type=\"spacer.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t<div class=\"elementor-spacer\">\n\t\t\t<div class=\"elementor-spacer-inner\"><\/div>\n\t\t<\/div>\n\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-e5a9d50 elementor-widget elementor-widget-heading\" data-id=\"e5a9d50\" data-element_type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t<h3 class=\"elementor-heading-title elementor-size-default\">Building an effective action plan<\/h3>\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-a7a7aac elementor-widget elementor-widget-text-editor\" data-id=\"a7a7aac\" data-element_type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p data-start=\"439\" data-end=\"611\">The action plan must be based on the lessons learned from the diagnosis, and respond to the causes identified. Several levers can be activated depending on the situation:<\/p><ul data-start=\"613\" data-end=\"1284\"><li data-start=\"613\" data-end=\"770\"><strong>Reallocate resources:<\/strong> adjust workloads to avoid overloading a team and optimize the use of available skills.<\/li><li data-start=\"771\" data-end=\"971\"><strong>Renegotiate deadlines or deliverables:<\/strong> whenever possible, discuss with the customer how to adjust the scope or push back certain deadlines in order to limit additional costs.<\/li><li data-start=\"972\" data-end=\"1101\"><strong>Revising estimates:<\/strong> update your forecasts for the remaining phases of the project to avoid worsening the deficit.<\/li><li data-start=\"1102\" data-end=\"1284\"><strong>Strengthen internal controls:<\/strong> implement more rigorous processes to validate scope changes and better manage adjustments during the project.<\/li><\/ul><p data-start=\"1286\" data-end=\"1485\"><br \/>Each action must be prioritized according to its impact on profitability and feasibility. An effective measure is one that can be implemented quickly without compromising the quality of the deliverable.<\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-0392dd0 elementor-widget elementor-widget-heading\" data-id=\"0392dd0\" data-element_type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t<h3 class=\"elementor-heading-title elementor-size-default\">The importance of communication<\/h3>\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-db55eb8 elementor-widget elementor-widget-text-editor\" data-id=\"db55eb8\" data-element_type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p data-start=\"1530\" data-end=\"1940\">Implementing an action plan requires fluid communication with all stakeholders. Internal teams need to understand the expected adjustments and the reasons behind them. On the customer side, transparency is essential. Clearly communicating any changes to deadlines or scope of work helps to avoid misunderstandings and maintain trust.   <\/p>\n<p data-start=\"1942\" data-end=\"2194\">Organize regular meetings with your project and financial teams to monitor the progress of measures taken. If renegotiations with the customer are necessary, prepare arguments based on concrete data from your diagnosis. <\/p>\n\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-6ba1fd3 elementor-widget elementor-widget-heading\" data-id=\"6ba1fd3\" data-element_type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t<h3 class=\"elementor-heading-title elementor-size-default\">Anticipate to avoid suffering<\/h3>\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-6d03eb5 elementor-widget elementor-widget-text-editor\" data-id=\"6d03eb5\" data-element_type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p data-start=\"2235\" data-end=\"2576\">Although this plan is designed to correct current drifts, it should also serve as a basis for preventing the situation from recurring. Proactive management means integrating these actions into your standard processes. In future, this will enable you to detect weak signals earlier and take action before the situation deteriorates.  <\/p>\n\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t<div class=\"elementor-element elementor-element-2ea59c7 e-flex e-con-boxed e-con e-parent\" data-id=\"2ea59c7\" data-element_type=\"container\">\n\t\t\t\t\t<div class=\"e-con-inner\">\n\t\t\t\t<div class=\"elementor-element elementor-element-b111a8b elementor-widget elementor-widget-spacer\" data-id=\"b111a8b\" data-element_type=\"widget\" data-widget_type=\"spacer.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t<div class=\"elementor-spacer\">\n\t\t\t<div class=\"elementor-spacer-inner\"><\/div>\n\t\t<\/div>\n\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-ca7130c elementor-widget elementor-widget-heading\" data-id=\"ca7130c\" data-element_type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t<h2 class=\"elementor-heading-title elementor-size-default\">Surgical action: anticipate budget overruns<\/h2>\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-559ea2d elementor-widget elementor-widget-text-editor\" data-id=\"559ea2d\" data-element_type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p>Correcting a loss-making project is essential, but the real mastery of financial management lies in anticipation. Preventing budget overruns makes it possible to limit late corrective action and maintain project profitability without compromising customer relations or the quality of deliverables. This proactive approach, comparable to a surgical operation, requires precision, responsiveness and the right tools to intervene at the right time.  <\/p>\n\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-9f35deb elementor-widget elementor-widget-heading\" data-id=\"9f35deb\" data-element_type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t<h3 class=\"elementor-heading-title elementor-size-default\">Agile, responsive budget management<\/h3>\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-4a0901d elementor-widget elementor-widget-text-editor\" data-id=\"4a0901d\" data-element_type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p data-start=\"601\" data-end=\"1021\">Projects rarely go over budget without warning signs. These indicators are often visible long before the overrun materializes. But you need to be able to detect them. Rigid budget management, set only at the start of the project, limits responsiveness to unforeseen circumstances. Conversely, an agile approach enables forecasts, resources and expenditure to be adjusted on an ongoing basis.    <\/p>\n<p data-start=\"1023\" data-end=\"1103\">Implementing agile budget management requires several key actions:<\/p>\n<ul data-start=\"1105\" data-end=\"1561\">\n<li data-start=\"1105\" data-end=\"1209\"><strong>Regularly update<\/strong> financial forecasts in line with actual project progress.<\/li>\n<li data-start=\"1210\" data-end=\"1316\">Accurately <strong>track time spent<\/strong> to adjust planning according to discrepancies.<\/li>\n<li data-start=\"1317\" data-end=\"1454\"><strong>Set up<\/strong> weekly <strong>checkpoints<\/strong> to anticipate work overloads or the need for additional resources.<\/li>\n<li data-start=\"1455\" data-end=\"1561\"><strong>React quickly to changes in<\/strong> scope or delays to limit their financial impact.<br><br><\/li>\n<\/ul>\n<p data-start=\"1563\" data-end=\"1734\">This dynamic of continuous adaptation means that you won&#8217;t discover a budget overrun when the project has already been finalized, by which time it&#8217;s often too late to react.<\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-eb8c8ae elementor-widget elementor-widget-heading\" data-id=\"eb8c8ae\" data-element_type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t<h3 class=\"elementor-heading-title elementor-size-default\">Understanding profitability right from the pre-sales stage<\/h3>\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-57682ee elementor-widget elementor-widget-text-editor\" data-id=\"57682ee\" data-element_type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p data-start=\"1790\" data-end=\"2174\">Anticipation doesn&#8217;t begin with production. It begins at the quotation and negotiation stage. Over-optimistic pre-sales estimates lead to unrealistic budgets that teams struggle to meet. That&#8217;s why it&#8217;s crucial to take all costs into account from the outset: management time, possible revisions, unforeseen customer feedback and technical contingencies.   <\/p>\n<p data-start=\"2176\" data-end=\"2189\">To do this:<\/p>\n<ul data-start=\"2190\" data-end=\"2429\">\n<li data-start=\"2190\" data-end=\"2262\"><strong>Analyze similar past projects<\/strong> to refine your estimates.<\/li>\n<li data-start=\"2263\" data-end=\"2335\"><strong>Build in<\/strong> realistic <strong>safety margins<\/strong> to cover unforeseen events.<\/li>\n<li data-start=\"2336\" data-end=\"2429\"><strong>Exchange with<\/strong> operational <strong>teams<\/strong> to validate the feasibility of proposed quotations.<br><br><\/li>\n<\/ul>\n<p data-start=\"2431\" data-end=\"2556\">Better upstream preparation limits any deviations that may occur along the way, and ensures smoother project management.<\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-c214e15 elementor-widget elementor-widget-heading\" data-id=\"c214e15\" data-element_type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t<h3 class=\"elementor-heading-title elementor-size-default\">The importance of real-time monitoring<\/h3>\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-6053a5e elementor-widget elementor-widget-text-editor\" data-id=\"6053a5e\" data-element_type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p data-start=\"2606\" data-end=\"2929\">To adjust your budget management, you need to have a clear and instantaneous view of your key indicators. Waiting until project closure to take stock is a frequent and costly mistake. Real-time monitoring allows you to intervene as soon as deviations appear, and prevent them from worsening.  <\/p>\n<p data-start=\"2931\" data-end=\"3004\">Modern management tools offer features such as :<\/p>\n<ul data-start=\"3005\" data-end=\"3359\">\n<li data-start=\"3005\" data-end=\"3126\"><strong>Automatic alerts<\/strong> when a project reaches certain consumption thresholds (50%, 75%, 90% of planned budget).<\/li>\n<li data-start=\"3127\" data-end=\"3248\">Automatically updated <strong>dashboards<\/strong> with hours entered, costs incurred and project progress.<\/li>\n<li data-start=\"3249\" data-end=\"3359\"><strong>Reports<\/strong> comparing initial forecasts with actual data to quickly identify discrepancies.<br><br><\/li>\n<\/ul>\n<p data-start=\"3361\" data-end=\"3548\">This responsiveness enables immediate corrective decisions to be taken, whether to reallocate resources, review the scope of the project or negotiate adjustments with the customer.<\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-7cddd13 elementor-widget elementor-widget-heading\" data-id=\"7cddd13\" data-element_type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t<h3 class=\"elementor-heading-title elementor-size-default\">Capitalize on lessons learned for future projects<\/h3>\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-be82ee6 blkCitation elementor-widget elementor-widget-image-box\" data-id=\"be82ee6\" data-element_type=\"widget\" data-widget_type=\"image-box.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t<div class=\"elementor-image-box-wrapper\"><div class=\"elementor-image-box-content\"><h3 class=\"elementor-image-box-title\">J\u00e9r\u00f4me Balmain, COO and co-founder - La Haute Soci\u00e9t\u00e9<\/h3><p class=\"elementor-image-box-description\"><i>Having a tool that covers the entire value chain, from centralization at the outset (quotation to pre-sales) to production and delivery of the device, enables us to be more consistent and better control our processes.<\/i><\/p><\/div><\/div>\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-d62e46b elementor-widget elementor-widget-text-editor\" data-id=\"d62e46b\" data-element_type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p data-start=\"3618\" data-end=\"3935\">Anticipating budget overruns also means learning from past experience. Every completed project, whether profitable or not, holds valuable lessons. Regular reviews help to identify recurring patterns of overruns and adjust practices for future projects.<\/p><p data-start=\"3937\" data-end=\"3970\"><strong>To optimize this process :<\/strong><\/p><ul data-start=\"3971\" data-end=\"4205\"><li data-start=\"3971\" data-end=\"4049\">Organize feedback meetings with the teams involved.<\/li><li data-start=\"4050\" data-end=\"4129\">Document the causes of deviations and the corrective actions taken.<\/li><li data-start=\"4130\" data-end=\"4205\">Update your estimating methodologies and internal processes.<br \/><br \/><\/li><\/ul><p data-start=\"4207\" data-end=\"4359\">By adopting this logic of continuous improvement, you strengthen your ability to anticipate slippage and secure the profitability of your projects.<\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-f8b2814 elementor-align-center elementor-widget elementor-widget-button\" data-id=\"f8b2814\" data-element_type=\"widget\" data-widget_type=\"button.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<div class=\"elementor-button-wrapper\">\n\t\t\t\t\t<a class=\"elementor-button elementor-button-link elementor-size-sm\" href=\"https:\/\/www.furious-squad.com\/en\/contact\/\">\n\t\t\t\t\t\t<span class=\"elementor-button-content-wrapper\">\n\t\t\t\t\t\t\t\t\t<span class=\"elementor-button-text\">Book a free demo<\/span>\n\t\t\t\t\t<\/span>\n\t\t\t\t\t<\/a>\n\t\t\t\t<\/div>\n\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t<div class=\"elementor-element elementor-element-6e89782 e-flex e-con-boxed e-con e-parent\" data-id=\"6e89782\" data-element_type=\"container\">\n\t\t\t\t\t<div class=\"e-con-inner\">\n\t\t\t\t<div class=\"elementor-element elementor-element-47cca56 elementor-widget elementor-widget-spacer\" data-id=\"47cca56\" data-element_type=\"widget\" data-widget_type=\"spacer.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t<div class=\"elementor-spacer\">\n\t\t\t<div class=\"elementor-spacer-inner\"><\/div>\n\t\t<\/div>\n\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-1b31fa6 elementor-widget elementor-widget-heading\" data-id=\"1b31fa6\" data-element_type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t<h2 class=\"elementor-heading-title elementor-size-default\">Integration of Risk Management<\/h2>\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-d3fc751 elementor-widget elementor-widget-text-editor\" data-id=\"d3fc751\" data-element_type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p data-start=\"47\" data-end=\"543\">Anticipating budget overruns requires rigorous risk management. Every project involves areas of uncertainty, whether in terms of scope variations, production delays or unforeseen costs. Ignoring these hazards exposes your projects to budget variances that are difficult to make up. Conversely, integrating risk management into your process enables you to identify potential failures before they affect profitability.   <\/p>\n\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-e988184 elementor-widget elementor-widget-heading\" data-id=\"e988184\" data-element_type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t<h3 class=\"elementor-heading-title elementor-size-default\">Identify risks upstream<\/h3>\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-8df9d36 elementor-widget elementor-widget-text-editor\" data-id=\"8df9d36\" data-element_type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p data-start=\"587\" data-end=\"738\">The first step is to identify potential risks at the planning stage. A project can be affected by various types of risk: <\/p>\n<ul data-start=\"739\" data-end=\"1100\">\n<li data-start=\"739\" data-end=\"832\"><strong>Operational:<\/strong> production delays, resource unavailability, technical errors<\/li>\n<li data-start=\"833\" data-end=\"931\"><strong>Financial:<\/strong> underestimation of costs, price fluctuations of service providers or suppliers<\/li>\n<li data-start=\"932\" data-end=\"1016\"><strong>Organizational:<\/strong> communication problems, unexpected scope changes<\/li>\n<li data-start=\"1017\" data-end=\"1100\"><strong>Contractual:<\/strong> poorly defined clauses can lead to additional costs<\/li>\n<\/ul>\n<p data-start=\"1102\" data-end=\"1375\"><br>To leave nothing to chance, it&#8217;s essential to formalize a risk analysis at the start of the project. Gather feedback from operational teams, identify critical points in the schedule and list elements likely to generate additional costs. <\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-6620445 elementor-widget elementor-widget-heading\" data-id=\"6620445\" data-element_type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t<h3 class=\"elementor-heading-title elementor-size-default\">Assessing probability and impact<\/h3>\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-5b956ae elementor-widget elementor-widget-text-editor\" data-id=\"5b956ae\" data-element_type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p data-start=\"1422\" data-end=\"1698\">Not all risks have the same level of severity. Once identified, it is necessary to classify them according to their probability of occurrence and their potential impact on budget and deadlines. This assessment enables us to prioritize the actions to be taken.  <\/p>\n<p data-start=\"1700\" data-end=\"1753\">You can use a risk matrix to :<\/p>\n<ul data-start=\"1754\" data-end=\"2035\">\n<li data-start=\"1754\" data-end=\"1851\"><strong>Identify<\/strong> high-impact, high-probability <strong>threats<\/strong> requiring immediate action<\/li>\n<li data-start=\"1852\" data-end=\"1950\"><strong>Prioritize risks<\/strong> that could have a significant impact on project profitability<\/li>\n<li data-start=\"1951\" data-end=\"2035\"><strong>Identify<\/strong> minor <strong>risks<\/strong> requiring only regular monitoring<\/li>\n<\/ul>\n<p data-start=\"2037\" data-end=\"2158\"><br>This approach avoids scattering efforts and allows resources to be concentrated on the most critical elements.<\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-80a5caf elementor-widget elementor-widget-heading\" data-id=\"80a5caf\" data-element_type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t<h3 class=\"elementor-heading-title elementor-size-default\">Set up response plans<\/h3>\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-2c193dc elementor-widget elementor-widget-text-editor\" data-id=\"2c193dc\" data-element_type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p data-start=\"2207\" data-end=\"2337\">Once the risks have been assessed, it&#8217;s time to define appropriate response plans. These plans can take several forms: <\/p>\n<ul data-start=\"2338\" data-end=\"2895\">\n<li data-start=\"2338\" data-end=\"2488\"><strong>Avoidance:<\/strong> modify the initial plan to eliminate the risk (e.g. choose a more reliable service provider, even if slightly more expensive).<\/li>\n<li data-start=\"2489\" data-end=\"2633\"><strong>Mitigation:<\/strong> implement actions to limit the probability or impact of the risk (adjust deadlines, reinforce monitoring of deliverables).<\/li>\n<li data-start=\"2634\" data-end=\"2763\"><strong>Transfer:<\/strong> outsource risk by subcontracting certain tasks or adjusting contractual clauses with the customer.<\/li>\n<li data-start=\"2764\" data-end=\"2895\"><strong>Acceptance:<\/strong> assume the risk if it is deemed minor or if the solutions are too costly in relation to the expected benefits.<\/li>\n<\/ul>\n<p data-start=\"2897\" data-end=\"3024\"><br>To be effective, each response plan must be assigned a manager and integrated into the day-to-day management of the project.<\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-331a733 elementor-widget elementor-widget-heading\" data-id=\"331a733\" data-element_type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t<h3 class=\"elementor-heading-title elementor-size-default\">Tools for proactive monitoring<\/h3>\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-d6246d9 elementor-widget elementor-widget-text-editor\" data-id=\"d6246d9\" data-element_type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p data-start=\"3093\" data-end=\"3337\">Risk management does not stop with risk identification. Ongoing monitoring is essential to detect any developments that could affect the project. Modern management tools offer specific functionalities:  <\/p>\n<ul data-start=\"3338\" data-end=\"3642\">\n<li data-start=\"3338\" data-end=\"3458\">Automatic alerts triggered when certain budget thresholds are reached (50%, 75% or 90% of budget consumed)<\/li>\n<li data-start=\"3459\" data-end=\"3536\">Risk reports updated in real time to anticipate slippage<\/li>\n<li data-start=\"3537\" data-end=\"3642\">Collaborative platforms enabling each team member to report points of vigilance<\/li>\n<\/ul>\n<p data-start=\"3644\" data-end=\"3788\"><br>Such monitoring enables decisions to be made on the basis of reliable data, without waiting for the project to exceed critical thresholds.<\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-a23ead9 elementor-widget elementor-widget-heading\" data-id=\"a23ead9\" data-element_type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t<h3 class=\"elementor-heading-title elementor-size-default\">Integrate risk management into your agency culture<\/h3>\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-e227f80 elementor-widget elementor-widget-text-editor\" data-id=\"e227f80\" data-element_type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p data-start=\"3860\" data-end=\"4152\">For this approach to be fully effective, it must become a reflex shared by all teams. Encourage your employees to report anomalies, organize regular reviews of risk trends, and align your internal processes with this preventive approach. <\/p>\n<p data-start=\"4154\" data-end=\"4332\">An agency that integrates risk management into its operational culture is better equipped to anticipate the unexpected, protect margins and boost customer satisfaction.<\/p>\n\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-97775ee elementor-align-center elementor-widget elementor-widget-button\" data-id=\"97775ee\" data-element_type=\"widget\" data-widget_type=\"button.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<div class=\"elementor-button-wrapper\">\n\t\t\t\t\t<a class=\"elementor-button elementor-button-link elementor-size-sm\" href=\"https:\/\/www.furious-squad.com\/en\/contact\/\">\n\t\t\t\t\t\t<span class=\"elementor-button-content-wrapper\">\n\t\t\t\t\t\t\t\t\t<span class=\"elementor-button-text\">Book a free demo<\/span>\n\t\t\t\t\t<\/span>\n\t\t\t\t\t<\/a>\n\t\t\t\t<\/div>\n\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t<div class=\"elementor-element elementor-element-6bd3fac e-flex e-con-boxed e-con e-parent\" data-id=\"6bd3fac\" data-element_type=\"container\">\n\t\t\t\t\t<div class=\"e-con-inner\">\n\t\t\t\t<div class=\"elementor-element elementor-element-e7c9108 elementor-widget elementor-widget-spacer\" data-id=\"e7c9108\" data-element_type=\"widget\" data-widget_type=\"spacer.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t<div class=\"elementor-spacer\">\n\t\t\t<div class=\"elementor-spacer-inner\"><\/div>\n\t\t<\/div>\n\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-9e97bc2 elementor-widget elementor-widget-heading\" data-id=\"9e97bc2\" data-element_type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t<h2 class=\"elementor-heading-title elementor-size-default\">Use project budgeting from the outset and throughout the project<\/h2>\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-8de603e elementor-widget elementor-widget-text-editor\" data-id=\"8de603e\" data-element_type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p data-start=\"82\" data-end=\"517\">Budgeting is often seen as a formality to be carried out at the start of a project. However, to guarantee profitability, it needs to be a living process, adjusted throughout the project life cycle. By integrating it from the earliest stages and updating it regularly, you gain in responsiveness and accuracy. This proactive approach limits budget variances and facilitates informed decision-making.   <\/p>\n\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-311ba04 elementor-widget elementor-widget-heading\" data-id=\"311ba04\" data-element_type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t<h3 class=\"elementor-heading-title elementor-size-default\">Define a clear scope and precise objectives<\/h3>\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-5bff7bc elementor-widget elementor-widget-text-editor\" data-id=\"5bff7bc\" data-element_type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p data-start=\"580\" data-end=\"836\">Effective budgeting starts with defining the scope of the project. The more precise the scope, the more accurate the estimates. All too often, unclear objectives and deliverables lead to misunderstandings and unforeseen cost overruns.  <\/p>\n<p data-start=\"838\" data-end=\"864\"><strong>To avoid these pitfalls:<\/strong><\/p>\n<ul data-start=\"865\" data-end=\"1168\">\n<li data-start=\"865\" data-end=\"947\">Draw up detailed specifications validated by all stakeholders<\/li>\n<li data-start=\"948\" data-end=\"1010\">Break the project down into sub-tasks with clear milestones<\/li>\n<li data-start=\"1011\" data-end=\"1079\">Identify resource requirements for each stage of the project<\/li>\n<li data-start=\"1080\" data-end=\"1168\">Prevent potential changes in scope by building in safety margins<br><br><\/li>\n<\/ul>\n<p data-start=\"1170\" data-end=\"1285\">A clear structure from the outset avoids costly adjustments along the way, and facilitates budget monitoring.<\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-6b1baa0 elementor-widget elementor-widget-heading\" data-id=\"6b1baa0\" data-element_type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t<h3 class=\"elementor-heading-title elementor-size-default\">Choose the Appropriate Budgeting Methodology<\/h3>\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-971fd74 elementor-widget elementor-widget-text-editor\" data-id=\"971fd74\" data-element_type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p data-start=\"1346\" data-end=\"1549\">Not all budgeting methods are created equal. The choice depends on the nature of the project, the complexity of the deliverables and the degree of flexibility required. There are three main approaches:  <\/p>\n<ul data-start=\"1551\" data-end=\"2232\">\n<li data-start=\"1551\" data-end=\"1778\"><strong>Top-down budgeting:<\/strong> the overall budget is defined before being allocated to the various phases. This method is fast, but may lack precision if project details are not yet well established. <\/li>\n<li data-start=\"1779\" data-end=\"1997\"><strong>Bottom-up budgeting:<\/strong> costs are estimated task by task before being consolidated. Longer to implement, this approach is ideal for complex projects requiring maximum precision. <\/li>\n<li data-start=\"1998\" data-end=\"2232\"><strong>Value-based budgeting:<\/strong> the budget is adjusted according to the value generated at each stage. This model, often used in agile methods, allows greater flexibility and better adaptation to unforeseen circumstances. <br><br><\/li>\n<\/ul>\n<p data-start=\"2234\" data-end=\"2385\">Whatever the choice, the most important thing is to choose the method that offers the best balance between precision, flexibility and speed of execution.<\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-cbf7826 elementor-widget elementor-widget-heading\" data-id=\"cbf7826\" data-element_type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t<h3 class=\"elementor-heading-title elementor-size-default\">Monitor and adjust throughout the project<\/h3>\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-1e25517 elementor-widget elementor-widget-heading\" data-id=\"1e25517\" data-element_type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t<h3 class=\"elementor-heading-title elementor-size-default\">The contribution of budget management tools<\/h3>\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-6fa7343 elementor-widget elementor-widget-text-editor\" data-id=\"6fa7343\" data-element_type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p data-start=\"2438\" data-end=\"2751\">Budgeting doesn&#8217;t stop when the quotation is approved. To be effective, it must be continually re-evaluated. Projects evolve: changes in scope, delays or resource adjustments can impact costs. Only regular budget updates can keep you on track.   <\/p>\n<p data-start=\"2753\" data-end=\"2778\"><strong>To ensure this follow-up :<\/strong><\/p>\n<ul data-start=\"2779\" data-end=\"3092\">\n<li data-start=\"2779\" data-end=\"2861\">Compare actual expenditure with initial forecasts at each key milestone<\/li>\n<li data-start=\"2862\" data-end=\"2927\">Analyze discrepancies and identify the causes of overruns<\/li>\n<li data-start=\"2928\" data-end=\"3013\">Adjust estimates for the remaining phases to limit future drift<\/li>\n<li data-start=\"3014\" data-end=\"3092\">Communicate these adjustments to teams to ensure global alignment<br><br><\/li>\n<\/ul>\n<p data-start=\"3094\" data-end=\"3221\">A living, up-to-date budget offers a more realistic vision of the project, avoiding unpleasant surprises at the end of the assignment.<\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-d177534 elementor-widget elementor-widget-text-editor\" data-id=\"d177534\" data-element_type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p data-start=\"3280\" data-end=\"3551\">Keeping track of a budget with scattered spreadsheets is a source of errors and wasted time. Today, centralized solutions can simplify this task while improving data reliability. A good budget management tool should offer :<\/p><ul data-start=\"3552\" data-end=\"3930\"><li data-start=\"3552\" data-end=\"3640\">Real-time visualization of expenses incurred and updated forecasts<\/li><li data-start=\"3641\" data-end=\"3729\">Automatic alerts when budget thresholds are close to being reached<\/li><li data-start=\"3730\" data-end=\"3834\">The ability to integrate time spent, billing and purchasing data for a global view<\/li><li data-start=\"3835\" data-end=\"3930\">Detailed reports facilitate decision-making and communication with customers<br \/><br \/><\/li><\/ul><p data-start=\"3932\" data-end=\"4073\">By using these tools, you can react quickly and adjust your plans in just a few clicks, without waiting until the end of the project to react.<\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-ca825e0 elementor-widget elementor-widget-heading\" data-id=\"ca825e0\" data-element_type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t<h3 class=\"elementor-heading-title elementor-size-default\">Promoting continuous improvement<\/h3>\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-45a45eb elementor-widget elementor-widget-text-editor\" data-id=\"45a45eb\" data-element_type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p data-start=\"4119\" data-end=\"4340\">Every project is a learning opportunity. By analyzing your past budgets and identifying areas for improvement, you strengthen your ability to estimate more accurately and better manage future projects. <\/p>\n<p data-start=\"4342\" data-end=\"4384\">To capitalize on these lessons :<\/p>\n<ul data-start=\"4385\" data-end=\"4630\">\n<li data-start=\"4385\" data-end=\"4454\">Organize end-of-project financial reviews with your teams<\/li>\n<li data-start=\"4455\" data-end=\"4542\">Document significant deviations and the solutions implemented to remedy them<\/li>\n<li data-start=\"4543\" data-end=\"4630\">Update your estimating methodologies to reflect this feedback<br><br><\/li>\n<\/ul>\n<p data-start=\"4632\" data-end=\"4765\">This continuous improvement process enables you to gain in precision and progressively optimize the profitability of your projects.<\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-99c3a42 elementor-align-center elementor-widget elementor-widget-button\" data-id=\"99c3a42\" data-element_type=\"widget\" data-widget_type=\"button.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<div class=\"elementor-button-wrapper\">\n\t\t\t\t\t<a class=\"elementor-button elementor-button-link elementor-size-sm\" href=\"https:\/\/www.furious-squad.com\/en\/contact\/\">\n\t\t\t\t\t\t<span class=\"elementor-button-content-wrapper\">\n\t\t\t\t\t\t\t\t\t<span class=\"elementor-button-text\">Book a free demo<\/span>\n\t\t\t\t\t<\/span>\n\t\t\t\t\t<\/a>\n\t\t\t\t<\/div>\n\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t<div class=\"elementor-element elementor-element-540d5c2 e-flex e-con-boxed e-con e-parent\" data-id=\"540d5c2\" data-element_type=\"container\">\n\t\t\t\t\t<div class=\"e-con-inner\">\n\t\t\t\t<div class=\"elementor-element elementor-element-560e8ec elementor-widget elementor-widget-spacer\" data-id=\"560e8ec\" data-element_type=\"widget\" data-widget_type=\"spacer.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t<div class=\"elementor-spacer\">\n\t\t\t<div class=\"elementor-spacer-inner\"><\/div>\n\t\t<\/div>\n\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-60cb40c elementor-widget elementor-widget-heading\" data-id=\"60cb40c\" data-element_type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t<h2 class=\"elementor-heading-title elementor-size-default\">Optimize your profitability with Furious\n<\/h2>\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-44e0bee elementor-widget elementor-widget-text-editor\" data-id=\"44e0bee\" data-element_type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p data-start=\"48\" data-end=\"428\">The profitability of your projects depends not only on methods, but also on the right tools. In an environment where responsiveness and precision are essential, Furious is the all-in-one solution you need. Budget management, resource planning, time tracking and invoicing are all brought together on the same platform to streamline your processes.  <\/p>\n\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-29358a1 elementor-widget elementor-widget-heading\" data-id=\"29358a1\" data-element_type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t<h3 class=\"elementor-heading-title elementor-size-default\">Simplify your project management\n<\/h3>\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-c4b9f95 elementor-widget elementor-widget-text-editor\" data-id=\"c4b9f95\" data-element_type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p data-start=\"472\" data-end=\"664\">Furious centralizes all your information, avoiding silos and losses. You benefit from a clear, global view to track your projects without friction.  With Furious, you can :<\/p>\n<ul data-start=\"665\" data-end=\"862\">\n<li data-start=\"665\" data-end=\"703\">Create quotes for your projects<\/li>\n<li data-start=\"704\" data-end=\"775\">Monitor your teams&#8217; working hours and adjust your forecasts<\/li>\n<li data-start=\"776\" data-end=\"822\">Manage billing without multiple tools<\/li>\n<li data-start=\"823\" data-end=\"862\">Visualize your margins in real time<\/li>\n<\/ul>\n\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-e7d3481 elementor-widget elementor-widget-heading\" data-id=\"e7d3481\" data-element_type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t<h3 class=\"elementor-heading-title elementor-size-default\">Promote collaboration and transparency\n<\/h3>\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-ecb18d9 elementor-widget elementor-widget-text-editor\" data-id=\"ecb18d9\" data-element_type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p data-start=\"917\" data-end=\"1315\">Smooth communication is the key to successful projects. Furious gives everyone involved access to the information they need: teams track their workloads, project managers monitor key indicators, and financial managers have access to up-to-date data. This transparency strengthens customer relations, thanks to accurate, easily-shared reports.  <\/p>\n\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-c422932 elementor-widget elementor-widget-heading\" data-id=\"c422932\" data-element_type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t<h3 class=\"elementor-heading-title elementor-size-default\">Make decisions based on reliable data\n<\/h3>\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-5615d88 elementor-widget elementor-widget-text-editor\" data-id=\"5615d88\" data-element_type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p data-start=\"1376\" data-end=\"1573\">Furious transforms your data into actionable information via intuitive dashboards. Quickly spot risky projects, measure your performance and adjust your strategy with : <\/p>\n<ul data-start=\"1574\" data-end=\"1808\">\n<li data-start=\"1574\" data-end=\"1633\">Alerts on budget overruns and delays<\/li>\n<li data-start=\"1634\" data-end=\"1687\">View margins by project or customer<\/li>\n<li data-start=\"1688\" data-end=\"1740\">Comparisons between forecasts and actuals<\/li>\n<li data-start=\"1741\" data-end=\"1808\">Analysis of occupancy rates to optimize resources<\/li>\n<\/ul>\n\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-c9b0bab elementor-widget elementor-widget-heading\" data-id=\"c9b0bab\" data-element_type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t<h3 class=\"elementor-heading-title elementor-size-default\">Choose a tool designed for agencies\n<\/h3>\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-dbc6b28 elementor-widget elementor-widget-text-editor\" data-id=\"dbc6b28\" data-element_type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p data-start=\"2384\" data-end=\"2638\">Furious adapts to your needs, whether you run a small team or a large organization. Free up your administrative time and focus on what really matters: customer satisfaction and the growth of your agency. <\/p>\n<p data-start=\"2640\" data-end=\"2706\" data-is-last-node=\"\" data-is-only-node=\"\"><a href=\"https:\/\/www.furious-squad.com\/en\/contact\/\">Request a free personalized demo today.<\/a><\/p>\n\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-97cdbaf elementor-align-center elementor-widget elementor-widget-button\" data-id=\"97cdbaf\" data-element_type=\"widget\" data-widget_type=\"button.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<div class=\"elementor-button-wrapper\">\n\t\t\t\t\t<a class=\"elementor-button elementor-button-link elementor-size-sm\" href=\"https:\/\/www.furious-squad.com\/en\/contact\/\">\n\t\t\t\t\t\t<span class=\"elementor-button-content-wrapper\">\n\t\t\t\t\t\t\t\t\t<span class=\"elementor-button-text\">Book a free demo<\/span>\n\t\t\t\t\t<\/span>\n\t\t\t\t\t<\/a>\n\t\t\t\t<\/div>\n\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t","protected":false},"excerpt":{"rendered":"<p>A figure lives only because it is shared and enriched by all the players in the chain. Matthieu Didailler, CFO d\u2019Insign This quote takes on its full meaning in the context of agencies, where financial management is more than just monitoring columns of figures. It&#8217;s a real balance between precision, anticipation and adaptation, where each [&hellip;]<\/p>\n","protected":false},"author":8,"featured_media":42955,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"content-type":"","footnotes":""},"categories":[21,466],"tags":[],"class_list":["post-45864","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-business","category-business-en-ok"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v25.3 (Yoast SEO v25.3.1) - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>Secure the profitability of your projects in an agency | Furious Squad<\/title>\n<meta name=\"description\" content=\"Discover the keys to good financial management in an agency, a task that goes beyond simply monitoring the numbers.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.furious-squad.com\/en\/agency-financial-management-profit\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Financial Management in an Agency: Secure the Profitability of Your Projects\" \/>\n<meta property=\"og:description\" content=\"Discover the keys to good financial management in an agency, a task that goes beyond simply monitoring the numbers.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.furious-squad.com\/en\/agency-financial-management-profit\/\" \/>\n<meta property=\"og:site_name\" content=\"Furious\" \/>\n<meta property=\"article:published_time\" content=\"2024-03-26T18:28:24+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2025-04-09T11:29:49+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.furious-squad.com\/wp-content\/uploads\/2024\/05\/Diriger-agence-rentable-FR-2.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1080\" \/>\n\t<meta property=\"og:image:height\" content=\"1080\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Alex Wattrelos\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Alex Wattrelos\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"15 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/www.furious-squad.com\/en\/agency-financial-management-profit\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/www.furious-squad.com\/en\/agency-financial-management-profit\/\"},\"author\":{\"name\":\"Alex Wattrelos\",\"@id\":\"https:\/\/www.furious-squad.com\/en\/#\/schema\/person\/4a570391e13c950d0306b0fa4ca421b3\"},\"headline\":\"Financial Management in an Agency: Secure the Profitability of Your Projects\",\"datePublished\":\"2024-03-26T18:28:24+00:00\",\"dateModified\":\"2025-04-09T11:29:49+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/www.furious-squad.com\/en\/agency-financial-management-profit\/\"},\"wordCount\":3453,\"publisher\":{\"@id\":\"https:\/\/www.furious-squad.com\/en\/#organization\"},\"image\":{\"@id\":\"https:\/\/www.furious-squad.com\/en\/agency-financial-management-profit\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/www.furious-squad.com\/wp-content\/uploads\/2024\/05\/Diriger-agence-rentable-FR-2.png\",\"articleSection\":[\"Affaires\",\"Business\"],\"inLanguage\":\"en-US\",\"copyrightYear\":\"2024\",\"copyrightHolder\":{\"@id\":\"https:\/\/www.furious-squad.com\/#organization\"}},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.furious-squad.com\/en\/agency-financial-management-profit\/\",\"url\":\"https:\/\/www.furious-squad.com\/en\/agency-financial-management-profit\/\",\"name\":\"Secure the profitability of your projects in an agency | Furious Squad\",\"isPartOf\":{\"@id\":\"https:\/\/www.furious-squad.com\/en\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/www.furious-squad.com\/en\/agency-financial-management-profit\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/www.furious-squad.com\/en\/agency-financial-management-profit\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/www.furious-squad.com\/wp-content\/uploads\/2024\/05\/Diriger-agence-rentable-FR-2.png\",\"datePublished\":\"2024-03-26T18:28:24+00:00\",\"dateModified\":\"2025-04-09T11:29:49+00:00\",\"description\":\"Discover the keys to good financial management in an agency, a task that goes beyond simply monitoring the numbers.\",\"breadcrumb\":{\"@id\":\"https:\/\/www.furious-squad.com\/en\/agency-financial-management-profit\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.furious-squad.com\/en\/agency-financial-management-profit\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.furious-squad.com\/en\/agency-financial-management-profit\/#primaryimage\",\"url\":\"https:\/\/www.furious-squad.com\/wp-content\/uploads\/2024\/05\/Diriger-agence-rentable-FR-2.png\",\"contentUrl\":\"https:\/\/www.furious-squad.com\/wp-content\/uploads\/2024\/05\/Diriger-agence-rentable-FR-2.png\",\"width\":1080,\"height\":1080},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.furious-squad.com\/en\/agency-financial-management-profit\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Accueil\",\"item\":\"https:\/\/www.furious-squad.com\/en\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Financial Management in an Agency: Secure the Profitability of Your Projects\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.furious-squad.com\/en\/#website\",\"url\":\"https:\/\/www.furious-squad.com\/en\/\",\"name\":\"Furious\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\/\/www.furious-squad.com\/en\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.furious-squad.com\/en\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/www.furious-squad.com\/en\/#organization\",\"name\":\"Furious\",\"url\":\"https:\/\/www.furious-squad.com\/en\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.furious-squad.com\/en\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/www.furious-squad.com\/wp-content\/uploads\/2024\/04\/Logo.svg\",\"contentUrl\":\"https:\/\/www.furious-squad.com\/wp-content\/uploads\/2024\/04\/Logo.svg\",\"width\":211,\"height\":42,\"caption\":\"Furious\"},\"image\":{\"@id\":\"https:\/\/www.furious-squad.com\/en\/#\/schema\/logo\/image\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\/\/www.furious-squad.com\/en\/#\/schema\/person\/4a570391e13c950d0306b0fa4ca421b3\",\"name\":\"Alex Wattrelos\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.furious-squad.com\/en\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/www.furious-squad.com\/wp-content\/uploads\/2024\/06\/Capture-decran-2025-06-17-a-10.47.31-96x96.png\",\"contentUrl\":\"https:\/\/www.furious-squad.com\/wp-content\/uploads\/2024\/06\/Capture-decran-2025-06-17-a-10.47.31-96x96.png\",\"caption\":\"Alex Wattrelos\"},\"description\":\"Product Leader\",\"url\":\"https:\/\/www.furious-squad.com\/en\/author\/alexfurious-squad-com\/\"}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Secure the profitability of your projects in an agency | Furious Squad","description":"Discover the keys to good financial management in an agency, a task that goes beyond simply monitoring the numbers.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.furious-squad.com\/en\/agency-financial-management-profit\/","og_locale":"en_US","og_type":"article","og_title":"Financial Management in an Agency: Secure the Profitability of Your Projects","og_description":"Discover the keys to good financial management in an agency, a task that goes beyond simply monitoring the numbers.","og_url":"https:\/\/www.furious-squad.com\/en\/agency-financial-management-profit\/","og_site_name":"Furious","article_published_time":"2024-03-26T18:28:24+00:00","article_modified_time":"2025-04-09T11:29:49+00:00","og_image":[{"width":1080,"height":1080,"url":"https:\/\/www.furious-squad.com\/wp-content\/uploads\/2024\/05\/Diriger-agence-rentable-FR-2.png","type":"image\/png"}],"author":"Alex Wattrelos","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Alex Wattrelos","Est. reading time":"15 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.furious-squad.com\/en\/agency-financial-management-profit\/#article","isPartOf":{"@id":"https:\/\/www.furious-squad.com\/en\/agency-financial-management-profit\/"},"author":{"name":"Alex Wattrelos","@id":"https:\/\/www.furious-squad.com\/en\/#\/schema\/person\/4a570391e13c950d0306b0fa4ca421b3"},"headline":"Financial Management in an Agency: Secure the Profitability of Your Projects","datePublished":"2024-03-26T18:28:24+00:00","dateModified":"2025-04-09T11:29:49+00:00","mainEntityOfPage":{"@id":"https:\/\/www.furious-squad.com\/en\/agency-financial-management-profit\/"},"wordCount":3453,"publisher":{"@id":"https:\/\/www.furious-squad.com\/en\/#organization"},"image":{"@id":"https:\/\/www.furious-squad.com\/en\/agency-financial-management-profit\/#primaryimage"},"thumbnailUrl":"https:\/\/www.furious-squad.com\/wp-content\/uploads\/2024\/05\/Diriger-agence-rentable-FR-2.png","articleSection":["Affaires","Business"],"inLanguage":"en-US","copyrightYear":"2024","copyrightHolder":{"@id":"https:\/\/www.furious-squad.com\/#organization"}},{"@type":"WebPage","@id":"https:\/\/www.furious-squad.com\/en\/agency-financial-management-profit\/","url":"https:\/\/www.furious-squad.com\/en\/agency-financial-management-profit\/","name":"Secure the profitability of your projects in an agency | Furious Squad","isPartOf":{"@id":"https:\/\/www.furious-squad.com\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.furious-squad.com\/en\/agency-financial-management-profit\/#primaryimage"},"image":{"@id":"https:\/\/www.furious-squad.com\/en\/agency-financial-management-profit\/#primaryimage"},"thumbnailUrl":"https:\/\/www.furious-squad.com\/wp-content\/uploads\/2024\/05\/Diriger-agence-rentable-FR-2.png","datePublished":"2024-03-26T18:28:24+00:00","dateModified":"2025-04-09T11:29:49+00:00","description":"Discover the keys to good financial management in an agency, a task that goes beyond simply monitoring the numbers.","breadcrumb":{"@id":"https:\/\/www.furious-squad.com\/en\/agency-financial-management-profit\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.furious-squad.com\/en\/agency-financial-management-profit\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.furious-squad.com\/en\/agency-financial-management-profit\/#primaryimage","url":"https:\/\/www.furious-squad.com\/wp-content\/uploads\/2024\/05\/Diriger-agence-rentable-FR-2.png","contentUrl":"https:\/\/www.furious-squad.com\/wp-content\/uploads\/2024\/05\/Diriger-agence-rentable-FR-2.png","width":1080,"height":1080},{"@type":"BreadcrumbList","@id":"https:\/\/www.furious-squad.com\/en\/agency-financial-management-profit\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Accueil","item":"https:\/\/www.furious-squad.com\/en\/"},{"@type":"ListItem","position":2,"name":"Financial Management in an Agency: Secure the Profitability of Your Projects"}]},{"@type":"WebSite","@id":"https:\/\/www.furious-squad.com\/en\/#website","url":"https:\/\/www.furious-squad.com\/en\/","name":"Furious","description":"","publisher":{"@id":"https:\/\/www.furious-squad.com\/en\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.furious-squad.com\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.furious-squad.com\/en\/#organization","name":"Furious","url":"https:\/\/www.furious-squad.com\/en\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.furious-squad.com\/en\/#\/schema\/logo\/image\/","url":"https:\/\/www.furious-squad.com\/wp-content\/uploads\/2024\/04\/Logo.svg","contentUrl":"https:\/\/www.furious-squad.com\/wp-content\/uploads\/2024\/04\/Logo.svg","width":211,"height":42,"caption":"Furious"},"image":{"@id":"https:\/\/www.furious-squad.com\/en\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/www.furious-squad.com\/en\/#\/schema\/person\/4a570391e13c950d0306b0fa4ca421b3","name":"Alex Wattrelos","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.furious-squad.com\/en\/#\/schema\/person\/image\/","url":"https:\/\/www.furious-squad.com\/wp-content\/uploads\/2024\/06\/Capture-decran-2025-06-17-a-10.47.31-96x96.png","contentUrl":"https:\/\/www.furious-squad.com\/wp-content\/uploads\/2024\/06\/Capture-decran-2025-06-17-a-10.47.31-96x96.png","caption":"Alex Wattrelos"},"description":"Product Leader","url":"https:\/\/www.furious-squad.com\/en\/author\/alexfurious-squad-com\/"}]}},"_links":{"self":[{"href":"https:\/\/www.furious-squad.com\/en\/wp-json\/wp\/v2\/posts\/45864","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.furious-squad.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.furious-squad.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.furious-squad.com\/en\/wp-json\/wp\/v2\/users\/8"}],"replies":[{"embeddable":true,"href":"https:\/\/www.furious-squad.com\/en\/wp-json\/wp\/v2\/comments?post=45864"}],"version-history":[{"count":12,"href":"https:\/\/www.furious-squad.com\/en\/wp-json\/wp\/v2\/posts\/45864\/revisions"}],"predecessor-version":[{"id":59549,"href":"https:\/\/www.furious-squad.com\/en\/wp-json\/wp\/v2\/posts\/45864\/revisions\/59549"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.furious-squad.com\/en\/wp-json\/wp\/v2\/media\/42955"}],"wp:attachment":[{"href":"https:\/\/www.furious-squad.com\/en\/wp-json\/wp\/v2\/media?parent=45864"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.furious-squad.com\/en\/wp-json\/wp\/v2\/categories?post=45864"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.furious-squad.com\/en\/wp-json\/wp\/v2\/tags?post=45864"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}