{"id":66336,"date":"2025-06-18T13:02:12","date_gmt":"2025-06-18T11:02:12","guid":{"rendered":"https:\/\/www.furious-squad.com\/?p=66336"},"modified":"2026-03-30T02:44:03","modified_gmt":"2026-03-30T00:44:03","slug":"top-5-planning-mistakes-agencies","status":"publish","type":"post","link":"https:\/\/www.furious-squad.com\/en\/top-5-planning-mistakes-agencies\/","title":{"rendered":"Top 5 Planning Mistakes in Agencies"},"content":{"rendered":"<p>Missed a deadline? Poorly anticipated a workload increase? Forgot that your teams weren\u2019t (yet) composed of tireless clones capable of delivering everything on time with a smile? Perfect. That\u2019s exactly what we\u2019re going to transform into a strategic advantage.    <\/p>\n<p>Planning errors are inevitable in agency life. But what distinguishes a high-performing organization from another is not the absence of errors. It\u2019s    <b>its ability to draw lasting lessons from them<\/b>, for the benefit of the team, profitability, and client satisfaction.<\/p>\n<p>Here\u2019s how.<\/p>\n<h2>Why Your Mistakes Are Worth Gold (If You Know How to Read Them)<br>\n<\/h2>\n<p><a href=\"https:\/\/www.pmi.org\/-\/media\/pmi\/documents\/public\/pdf\/learning\/thought-leadership\/pulse\/pmi-pulse-2020-final.pdf\">According to PMI<\/a>, <a href=\"https:\/\/www.furious-squad.com\/en\/web-agency-project-planning\/\">poorly planned projects<\/a>  cost an average of 11.4% extra budget. And yet, few agencies truly capitalize on their mistakes. <\/p>\n<p>Why? Because we often prefer to \u201cmove on\u201d rather than look in the rearview mirror. Bad move. An unanalyzed error is an error we\u2019ll pay for\u2026 twice.   <\/p>\n<p><b>Here are 3 pieces of good news:<\/b><\/p>\n<ol>\n<li style=\"font-weight: 400;\" aria-level=\"1\">An error is rarely the fault of an isolated individual (phew!).<\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\">A repeated error signals a systemic weakness (and therefore repairable).<\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\">A well-exploited error creates a culture of continuous improvement (and strengthens team cohesion).<\/li>\n<\/ol>\n<h2>Top 5 Planning Mistakes<\/h2>\n<h3>1. Overestimating Your Teams\u2019 Capabilities<\/h3>\n<p>You may have thought (or said) it before: <i>\u201cThey can handle it, it\u2019s not that heavy.\u201d<\/i><i><br><\/i>In reality? Chronic overload is one of the primary factors of burnout in agencies. <\/p>\n<p>A resource is not 100% available. Mental load, changing priorities, unforeseen events\u2026 all of this eats into time. <\/p>\n<p><b>To do<\/b>: base your schedules on realistic capacity (70 to 80% max), especially for key profiles.<\/p>\n<h2>2. Underestimating Invisible Workloads<\/h2>\n<p>Meetings, reporting, internal validations, coordination\u2026<br>These tasks are never in the retrospective planning, but they cost a lot in real time.<br>A study by McKinsey reveals that managers spend an average of <b>62% of their week in coordination rather than actual production<\/b>.<br><b><br>To do<\/b>: integrate indirect workloads into each schedule, as you would for any deliverable task.<\/p>\n<h2>3. Forgetting the Human Dimension<br>\n<\/h2>\n<p>Your collaborators are neither interchangeable, nor infallible, nor available 365 days a year.<br>A vacation, an illness, a drop in performance? Nothing exceptional\u2026 unless everything relies on that person. <br><b><br>To do<\/b> : plan with a human buffer. And think redundancy for critical skills. <\/p>\n<h2>4. Neglecting Client Validations<\/h2>\n<p><i>\u201cWe\u2019re just waiting for a quick go-ahead from the client.\u201d<\/i> \u2014 You\u2019ve heard that before.<\/p>\n<p>Except that a \u201cquick go-ahead\u201d often turns into <b>back-and-forth over 10 days<\/b>, or more.<\/p>\n<p><b>To do<\/b>: explicitly integrate  feedback and modification times into your schedules. And negotiate a maximum number of back-and-forths upfront. <\/p>\n<blockquote>\n<p>\n\t\t\t\tWe are starting to track project criticality and easily visualize overruns. This is valuable for quick reactions.  \t\t\t<\/p>\n<p>\t\t\t\t\t\t\t\t\t\t\t<cite>V\u00e9ronique Gervais, Head of Digital Division at O2M<\/cite>\n\t\t\t\t\t<\/p><\/blockquote>\n<h2>5. Reproducing the Same Patterns Without Questioning<\/h2>\n<p>The previous project ended in an overnight sprint? But we\u2019re keeping the same schedule for the next one? <\/p>\n<p>Nothing is more costly than repeating predictable mistakes.<\/p>\n<p><b>To do<\/b> : set up a systematic feedback loop at the end of each project. Even 30 minutes is enough to capitalize on the experience while it\u2019s fresh. <\/p>\n<h2>Transform error into collective intelligence<\/h2>\n<p>Rather than punishing, <b>showcase your mistakes<\/b>. It\u2019s a powerful lever to  <a href=\"https:\/\/www.furious-squad.com\/en\/recruit-top-talent-competitive-market\/\">improve the skills of the entire team<\/a>.<\/p>\n<h3>1. Organize \u201cproject reviews\u201d after the fact<br>\n<\/h3>\n<p>Take 45 minutes, some post-its, and put everything on the table: what worked, what didn\u2019t, why. Let the teams speak, not the managers. Objective: clarity + kindness.  <\/p>\n<h3>2. Create a shared lessons learned database<br>\n<\/h3>\n<p>A Notion, a Drive, or an internal tool, it doesn\u2019t matter. Each experience feedback is recorded as a sheet: \u201cError \u2013 Impact \u2013 Lesson \u2013 New Practice\u201d. <\/p>\n<p>Your library of blunders becomes a gold mine.<\/p>\n<h3>3. Evolve your processes, not just your schedules<br>\n<\/h3>\n<p>If you\u2019re consistently two days short for mockups, maybe it\u2019s your estimation method that needs reviewing, not just \u201cadding margin\u201d.<\/p>\n<table>\n<tbody>\n<tr>\n<td>\n<p><b>Situation<\/b><\/p>\n<\/td>\n<td>\n<p><b>Instinctive reaction<\/b><\/p>\n<\/td>\n<td>\n<p><b>Learning reaction<\/b><\/p>\n<\/td>\n<\/tr>\n<tr>\n<td>\n<p>Campaign delivered late<\/p>\n<\/td>\n<td>\n<p>We blame the team or the client<\/p>\n<\/td>\n<td>\n<p>We review <a href=\"https:\/\/www.furious-squad.com\/en\/automated-resource-planning-for-agencies\/\">resource allocation<\/a> and internal validation<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td>\n<p>Sprint blown up by day 2<\/p>\n<\/td>\n<td>\n<p>\u201cWe\u2019ll do better next time\u201d<\/p>\n<\/td>\n<td>\n<p>We analyze the gaps between forecast and actual<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td>\n<p>Task forgotten in the retroplanning<\/p>\n<\/td>\n<td>\n<p>\u201cNo big deal, we did it in a rush\u201d<\/p>\n<\/td>\n<td>\n<p>We update the planning templates<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td>\n<p>Unexpected client feedback<\/p>\n<\/td>\n<td>\n<p>\u201cIt wasn\u2019t planned\u201d<\/p>\n<\/td>\n<td>\n<p>We review the validation process and margins<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td>\n<p>Overload of a key profile<\/p>\n<\/td>\n<td>\n<p>We move a task \u201cin a rush\u201d<\/p>\n<\/td>\n<td>\n<p>We rethink the distribution and workload alerts<\/p>\n<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<h2>Benefits of a learning culture around mistakes<br>\n<\/h2>\n<ul>\n<li style=\"font-weight: 400;\" aria-level=\"1\">Less mental load for your project managers<\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\">More realistic schedules = better served clients<\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\">A cross-functional skill improvement of teams<\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\">A healthier atmosphere: people dare to say when things get stuck<\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\">Better profitability through continuous optimization<\/li>\n<\/ul>\n<p>And the icing on the cake: your teams no longer flee project reviews like the plague. They look forward to them as useful exchange moments. Crazy, right?  <\/p>\n<h2>The Furious method  <\/h2>\n<p>Want to go further? With   <b>Furious<\/b>, each <a href=\"https:\/\/www.furious-squad.com\/en\/solution\/project-management\/\">project<\/a>  becomes a source of truth. The tool allows you to: <\/p>\n<ul>\n<li style=\"font-weight: 400;\" aria-level=\"1\">Analyze the gaps between planned and actual<b>, project by project<\/b><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\">Identify recurring bottlenecks<\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\">Streamline your post-project feedback with reliable data<\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\">Improve your future estimates thanks to historical data\n<\/li>\n<\/ul>\n<p>In short, no more blind management. You transform each past failure into a future competitive advantage. <\/p>\n<p>Want to see how this translates in your context?  Request your personalized demo:<\/p>\n<p>\t\t\t\t\t<a href=\"https:\/\/www.furious-squad.com\/en\/contact\/\"><br>\n\t\t\t\t\t\t\t\t\tRequest a demo<br>\n\t\t\t\t\t<\/a><\/p>\n<h3>You may be asking<br>\n<strong>yourself these questions?<\/strong><\/h3>\n<details id=\"e-n-accordion-item-1070\" open>\n<summary data-accordion-index=\"1\" tabindex=\"0\" aria-expanded=\"true\" aria-controls=\"e-n-accordion-item-1070\">\n\t\t\t\t\t <strong>01<\/strong> how to Prevent Mistakes from Being Experienced as Failures?<br>\n\t\t\t<svg xmlns=\"http:\/\/www.w3.org\/2000\/svg\" width=\"25\" height=\"24\" viewbox=\"0 0 25 24\" fill=\"none\"><path d=\"M19.0645 14L12.0645 21M12.0645 21L5.06445 14M12.0645 21L12.0645 3\" stroke=\"#1E2238\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><br>\n\t\t\t<svg xmlns=\"http:\/\/www.w3.org\/2000\/svg\" width=\"25\" height=\"24\" viewbox=\"0 0 25 24\" fill=\"none\"><path d=\"M14.0645 5L21.0645 12M21.0645 12L14.0645 19M21.0645 12L3.06445 12\" stroke=\"#7E8492\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><br>\n\t\t\t\t\t\t<\/summary>\n<p>By integrating them into a continuous improvement logic. We analyze, we understand, we adjust. No blame, only learning.  <\/p>\n<\/details>\n<details id=\"e-n-accordion-item-1071\">\n<summary data-accordion-index=\"2\" tabindex=\"-1\" aria-expanded=\"false\" aria-controls=\"e-n-accordion-item-1071\">\n\t\t\t\t\t <strong>02<\/strong> should We Organize a Review for all Projects?<br>\n\t\t\t<svg xmlns=\"http:\/\/www.w3.org\/2000\/svg\" width=\"25\" height=\"24\" viewbox=\"0 0 25 24\" fill=\"none\"><path d=\"M19.0645 14L12.0645 21M12.0645 21L5.06445 14M12.0645 21L12.0645 3\" stroke=\"#1E2238\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><br>\n\t\t\t<svg xmlns=\"http:\/\/www.w3.org\/2000\/svg\" width=\"25\" height=\"24\" viewbox=\"0 0 25 24\" fill=\"none\"><path d=\"M14.0645 5L21.0645 12M21.0645 12L14.0645 19M21.0645 12L3.06445 12\" stroke=\"#7E8492\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><br>\n\t\t\t\t\t\t<\/summary>\n<p>Not necessarily. Focus on significant projects or those that have experienced major deviations. The goal is impact, not bureaucracy.  <\/p>\n<\/details>\n<details id=\"e-n-accordion-item-1072\">\n<summary data-accordion-index=\"3\" tabindex=\"-1\" aria-expanded=\"false\" aria-controls=\"e-n-accordion-item-1072\">\n\t\t\t\t\t <strong>03<\/strong> how to Involve Teams in this Approach?<br>\n\t\t\t<svg xmlns=\"http:\/\/www.w3.org\/2000\/svg\" width=\"25\" height=\"24\" viewbox=\"0 0 25 24\" fill=\"none\"><path d=\"M19.0645 14L12.0645 21M12.0645 21L5.06445 14M12.0645 21L12.0645 3\" stroke=\"#1E2238\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><br>\n\t\t\t<svg xmlns=\"http:\/\/www.w3.org\/2000\/svg\" width=\"25\" height=\"24\" viewbox=\"0 0 25 24\" fill=\"none\"><path d=\"M14.0645 5L21.0645 12M21.0645 12L14.0645 19M21.0645 12L3.06445 12\" stroke=\"#7E8492\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><br>\n\t\t\t\t\t\t<\/summary>\n<p>By putting them at the center of the process. The error doesn\u2019t come \u201cfrom the top\u201d nor \u201cfrom the ground\u201d: it\u2019s collective. Your teams often have the best ideas to correct it.  <\/p>\n<\/details>\n<details id=\"e-n-accordion-item-1073\">\n<summary data-accordion-index=\"4\" tabindex=\"-1\" aria-expanded=\"false\" aria-controls=\"e-n-accordion-item-1073\">\n\t\t\t\t\t <strong>04<\/strong> What to Do if the Same Mistakes Keep Recurring?<br>\n\t\t\t<svg xmlns=\"http:\/\/www.w3.org\/2000\/svg\" width=\"25\" height=\"24\" viewbox=\"0 0 25 24\" fill=\"none\"><path d=\"M19.0645 14L12.0645 21M12.0645 21L5.06445 14M12.0645 21L12.0645 3\" stroke=\"#1E2238\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><br>\n\t\t\t<svg xmlns=\"http:\/\/www.w3.org\/2000\/svg\" width=\"25\" height=\"24\" viewbox=\"0 0 25 24\" fill=\"none\"><path d=\"M14.0645 5L21.0645 12M21.0645 12L14.0645 19M21.0645 12L3.06445 12\" stroke=\"#7E8492\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><br>\n\t\t\t\t\t\t<\/summary>\n<p>It\u2019s a strong signal. Either the problem is poorly identified, or the proposed solutions are not being applied. In both cases, a broader reassessment is needed.  <\/p>\n<\/details>\n<details id=\"e-n-accordion-item-1074\">\n<summary data-accordion-index=\"5\" tabindex=\"-1\" aria-expanded=\"false\" aria-controls=\"e-n-accordion-item-1074\">\n\t\t\t\t\t <strong>05<\/strong> are there Tools to Better Track Planning Errors?<br>\n\t\t\t<svg xmlns=\"http:\/\/www.w3.org\/2000\/svg\" width=\"25\" height=\"24\" viewbox=\"0 0 25 24\" fill=\"none\"><path d=\"M19.0645 14L12.0645 21M12.0645 21L5.06445 14M12.0645 21L12.0645 3\" stroke=\"#1E2238\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><br>\n\t\t\t<svg xmlns=\"http:\/\/www.w3.org\/2000\/svg\" width=\"25\" height=\"24\" viewbox=\"0 0 25 24\" fill=\"none\"><path d=\"M14.0645 5L21.0645 12M21.0645 12L14.0645 19M21.0645 12L3.06445 12\" stroke=\"#7E8492\" stroke-width=\"2\" stroke-linecap=\"round\" stroke-linejoin=\"round\"><\/path><\/svg><br>\n\t\t\t\t\t\t<\/summary>\n<p>Yes, particularly Furious, which allows you to track discrepancies, time spent, actual workloads, and adjust your methods with concrete indicators.<\/p>\n<\/details>\n\n\n\n\n\n","protected":false},"excerpt":{"rendered":"<p>Missed a deadline? Poorly anticipated a workload increase? Forgot that your teams weren\u2019t (yet) composed of tireless clones capable of delivering everything on time with a smile? Perfect. That\u2019s exactly what we\u2019re going to transform into a strategic advantage. Planning errors are inevitable in agency life. But what distinguishes a high-performing organization from another is [&hellip;]<\/p>\n","protected":false},"author":10,"featured_media":66314,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"om_disable_all_campaigns":false,"_monsterinsights_skip_tracking":false,"footnotes":""},"categories":[452],"tags":[],"class_list":["post-66336","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-staffing-en"],"acf":[],"aioseo_notices":[],"aioseo_head":"\n\t\t<!-- All in One SEO 4.9.8 - aioseo.com -->\n\t<meta name=\"description\" content=\"Missed a deadline? Poorly anticipated a workload increase? Forgot that your teams weren&#039;t (yet) composed of tireless clones capable of delivering everything on time with a smile? Perfect. That&#039;s exactly what we&#039;re going to transform into a strategic advantage. Planning errors are inevitable in agency life. But what distinguishes a high-performing organization from another is\" \/>\n\t<meta name=\"robots\" content=\"max-image-preview:large\" \/>\n\t<meta name=\"author\" content=\"Juliette Saez-Lopez\"\/>\n\t<link rel=\"canonical\" href=\"https:\/\/www.furious-squad.com\/en\/top-5-planning-mistakes-agencies\/\" \/>\n\t<meta name=\"generator\" content=\"All in One SEO (AIOSEO) 4.9.8\" \/>\n\t\t<meta property=\"og:locale\" content=\"en_US\" \/>\n\t\t<meta property=\"og:site_name\" content=\"Furious squad \u2013 Pilotez projets, \u00e9quipes et rentabilit\u00e9 au m\u00eame endroit.\" \/>\n\t\t<meta property=\"og:type\" content=\"article\" \/>\n\t\t<meta property=\"og:title\" content=\"Top 5 Planning Mistakes in Agencies\" \/>\n\t\t<meta property=\"og:description\" content=\"Missed a deadline? Poorly anticipated a workload increase? Forgot that your teams weren&#039;t (yet) composed of tireless clones capable of delivering everything on time with a smile? Perfect. That&#039;s exactly what we&#039;re going to transform into a strategic advantage. Planning errors are inevitable in agency life. But what distinguishes a high-performing organization from another is\" \/>\n\t\t<meta property=\"og:url\" content=\"https:\/\/www.furious-squad.com\/en\/top-5-planning-mistakes-agencies\/\" \/>\n\t\t<meta property=\"article:published_time\" content=\"2025-06-18T11:02:12+00:00\" \/>\n\t\t<meta property=\"article:modified_time\" content=\"2026-03-30T00:44:03+00:00\" \/>\n\t\t<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n\t\t<meta name=\"twitter:title\" content=\"Top 5 Planning Mistakes in Agencies\" \/>\n\t\t<meta name=\"twitter:description\" content=\"Missed a deadline? Poorly anticipated a workload increase? Forgot that your teams weren&#039;t (yet) composed of tireless clones capable of delivering everything on time with a smile? Perfect. That&#039;s exactly what we&#039;re going to transform into a strategic advantage. Planning errors are inevitable in agency life. But what distinguishes a high-performing organization from another is\" \/>\n\t\t<!-- All in One SEO -->\n\n","aioseo_head_json":{"title":"Top 5 Planning Mistakes in Agencies","description":"Missed a deadline? Poorly anticipated a workload increase? Forgot that your teams weren't (yet) composed of tireless clones capable of delivering everything on time with a smile? Perfect. That's exactly what we're going to transform into a strategic advantage. Planning errors are inevitable in agency life. But what distinguishes a high-performing organization from another is","canonical_url":"https:\/\/www.furious-squad.com\/en\/top-5-planning-mistakes-agencies\/","robots":"max-image-preview:large","keywords":"","webmasterTools":{"miscellaneous":""},"schema":null,"og:locale":"en_US","og:site_name":"Furious squad \u2013 Pilotez projets, \u00e9quipes et rentabilit\u00e9 au m\u00eame endroit.","og:type":"article","og:title":"Top 5 Planning Mistakes in Agencies","og:description":"Missed a deadline? Poorly anticipated a workload increase? Forgot that your teams weren't (yet) composed of tireless clones capable of delivering everything on time with a smile? Perfect. That's exactly what we're going to transform into a strategic advantage. Planning errors are inevitable in agency life. But what distinguishes a high-performing organization from another is","og:url":"https:\/\/www.furious-squad.com\/en\/top-5-planning-mistakes-agencies\/","article:published_time":"2025-06-18T11:02:12+00:00","article:modified_time":"2026-03-30T00:44:03+00:00","twitter:card":"summary_large_image","twitter:title":"Top 5 Planning Mistakes in Agencies","twitter:description":"Missed a deadline? Poorly anticipated a workload increase? Forgot that your teams weren't (yet) composed of tireless clones capable of delivering everything on time with a smile? Perfect. That's exactly what we're going to transform into a strategic advantage. Planning errors are inevitable in agency life. But what distinguishes a high-performing organization from another is"},"aioseo_meta_data":{"post_id":"66336","title":null,"description":null,"keywords":null,"keyphrases":null,"primary_term":null,"canonical_url":null,"og_title":null,"og_description":null,"og_object_type":"default","og_image_type":"default","og_image_custom_url":null,"og_image_custom_fields":null,"og_image_url":null,"og_image_width":null,"og_image_height":null,"og_video":null,"og_custom_url":null,"og_article_section":null,"og_article_tags":null,"twitter_use_og":false,"twitter_card":"default","twitter_image_type":"default","twitter_image_custom_url":null,"twitter_image_custom_fields":null,"twitter_image_url":null,"twitter_title":null,"twitter_description":null,"schema_type":"default","schema_type_options":null,"schema":{"blockGraphs":[],"customGraphs":[],"default":{"data":{"Article":[],"Course":[],"Dataset":[],"FAQPage":[],"Movie":[],"Person":[],"Product":[],"ProductReview":[],"Car":[],"Recipe":[],"Service":[],"SoftwareApplication":[],"WebPage":[]},"graphName":"","isEnabled":true},"graphs":[]},"pillar_content":false,"robots_default":true,"robots_noindex":false,"robots_noarchive":false,"robots_nosnippet":false,"robots_nofollow":false,"robots_noimageindex":false,"robots_noodp":false,"robots_notranslate":false,"robots_max_snippet":null,"robots_max_videopreview":null,"robots_max_imagepreview":"large","priority":null,"frequency":null,"local_seo":null,"limit_modified_date":false,"ai":null,"breadcrumb_settings":null,"seo_analyzer_scan_date":null,"created":"2026-06-25 09:34:20","updated":"2026-06-25 09:34:20"},"aioseo_breadcrumb":"<div class=\"aioseo-breadcrumbs\"><span class=\"aioseo-breadcrumb\">\n\t\t\t<a href=\"https:\/\/www.furious-squad.com\/en\/\" title=\"Home\">Home<\/a>\n\t\t<\/span><span class=\"aioseo-breadcrumb-separator\">&raquo;<\/span><span class=\"aioseo-breadcrumb\">\n\t\t\t<a href=\"https:\/\/www.furious-squad.com\/en\/category\/staffing-en\/\" title=\"Staffing\">Staffing<\/a>\n\t\t<\/span><span class=\"aioseo-breadcrumb-separator\">&raquo;<\/span><span class=\"aioseo-breadcrumb\">\n\t\t\tTop 5 Planning Mistakes in Agencies\n\t\t<\/span><\/div>","aioseo_breadcrumb_json":[{"label":"Home","link":"https:\/\/www.furious-squad.com\/en\/"},{"label":"Staffing","link":"https:\/\/www.furious-squad.com\/en\/category\/staffing-en\/"},{"label":"Top 5 Planning Mistakes in Agencies","link":"https:\/\/www.furious-squad.com\/en\/top-5-planning-mistakes-agencies\/"}],"_links":{"self":[{"href":"https:\/\/www.furious-squad.com\/en\/wp-json\/wp\/v2\/posts\/66336","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.furious-squad.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.furious-squad.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.furious-squad.com\/en\/wp-json\/wp\/v2\/users\/10"}],"replies":[{"embeddable":true,"href":"https:\/\/www.furious-squad.com\/en\/wp-json\/wp\/v2\/comments?post=66336"}],"version-history":[{"count":1,"href":"https:\/\/www.furious-squad.com\/en\/wp-json\/wp\/v2\/posts\/66336\/revisions"}],"predecessor-version":[{"id":106973,"href":"https:\/\/www.furious-squad.com\/en\/wp-json\/wp\/v2\/posts\/66336\/revisions\/106973"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.furious-squad.com\/en\/wp-json\/wp\/v2\/media\/66314"}],"wp:attachment":[{"href":"https:\/\/www.furious-squad.com\/en\/wp-json\/wp\/v2\/media?parent=66336"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.furious-squad.com\/en\/wp-json\/wp\/v2\/categories?post=66336"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.furious-squad.com\/en\/wp-json\/wp\/v2\/tags?post=66336"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}